Question: 2. Given: a. Determine the low-level coding (in a tree structure) and the quantity of each component necessary to produce 10 units of the Alpha
2. Given: a. Determine the low-level coding (in a tree structure) and the quantity of each component necessary to produce 10 units of the Alpha Assembly shown above. Lead times are given in weeks, and quantities are given in parenthesis. b. How long does it take to make 1 unit of alpha? c. The company uses a 7 week rolling wave planning horizon. The forecast for end item Alpha in weeks 1117 is as follows: There is expected to be 21 units of Alpha in finished goods inventory at the end of week 10. What is the MPS for the trumpets? d. What is the planned order release for Alpha using a lot for lot policy? e. Consider subassembly B next assuming the company expects an on-hand inventory of 50Bs at the end of week 9 and a receipt from an outside vendor of 12 at the start of week 10. The company uses the Silver Meal Heuristic (least period cost) method for determining the production schedule. A setup costs $100 and holding costs are $1 per week. What is the production schedule for subassembly B using the silver Meal Heuristic? f. Now consider component C. What is the production schedule for C if there is no expected on-hand inventory and no scheduled receipts. The company uses a lot for. Lot policy for this component
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
