Question: 2. Integration testing (29 pts) The figure below shows the relationship of subsy stems that make up a larger system. M7 M8 M9 M3 M4
2. Integration testing (29 pts) The figure below shows the relationship of subsy stems that make up a larger system. M7 M8 M9 M3 M4 Main M5-M6 M11 M2H M6 M10 List all the steps needed to integrate this system using a top-down approach. Use breadth-first and list the test stubs or test drivers needed for each step. Use IS to indicate an integrated system and M#, to indicate a stub or driver. Ex. Step 1: IS ...(Needs: M.. , M..)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts