Question: 2. Lean Operations LO1, LO2, LO3 (20 Points) PT Bulan Sabit is a company engaged in manufacturing fans air conditioner with production data as follows
2. Lean Operations LO1, LO2, LO3 (20 Points) PT Bulan Sabit is a company engaged in manufacturing fans air conditioner with production data as follows i. Setup fee = $15 ii. Inventory cost per fan per year = $125 iii. Production capacity per day = 252 fans iv. Production time per fan = 2 days v. Fan requirement per year = 20,000 fans vi. Safety stock = 1/2 fan production day If PT Bulan Sabit wants to implement Kanban, then calculate the company's needs are as follows: a) Explain the definition and purpose of implementing Kanban (5 points) b) Determine the production order quantity (8 Points) c) Calculate the kanban container that must be provided by PT Bulan Sabit (7 points)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
