Question: 2 nd Crane Question ABX Construction has decided to use a tower crane on a building site. The required hook reach will be 1 8

2nd Crane Question
ABX Construction has decided to use a tower crane on a building site. The required hook reach will be 185 ft.
The crane will be equipped with an L6 jib and a four-part hoist line (see Tables 17.3 in textbook, pick correct chart).
What is the MAXIMUM AMUNT OF LOAD tht this crane configuration can withstand?
Group of answer choices
9,300 lbs
9,100 lbs
10,700 lbs
11,500 lbs