Question: 2. Open Model 4-2 and make one run. Record the total numbers of the three types of parts shipped shaped, and scrapped that have left

2. Open Model 4-2 and make one run. Record the
2. Open Model 4-2 and make one run. Record the total numbers of the three types of parts shipped shaped, and scrapped that have left the system. Sealer and rework utilizan and total time for Part A and Part It, and filled in the attached table b. Corrider Model 43. Asume that the rework times for Part A and Partn are different. Tur rework time for Part A EXPO minuters and that for Parts Expoco minutos Use Assen module to defense an attributes. Also the probability of passing inspection after seale operation is restead of 91. Modify the model to present the above chan Save your model as Name Surname 312 MTQ2.don. Run the model and in the following table: Model 2 Performance measures Model Total numbers of shipped parts left the ystem Total numbers of salvaged parts of the system Total numbers of scrapped parts left the ystem Sealer Utilisation Kscheduled utilisation Rewark utilation scheduled utilization) Average total time in systum for Part A minute Average total time in system for Part 3 minute) Notes You can choose to there in the attached word file and upload it or use on paper to write down all answers and take a photo to upload

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!