Question: 2 The diagram shows two catchments A and B . The run - off from Area A is collected in catch pit x and from

2 The diagram shows two catchments A and B. The run-off from Area A is collected in catch
pit x and from there it flows along an underground pipe (pipe 1) to catch pit Y where the
run-off from area B is also collected. The combined flow from the two areas discharges
via pipe (2). The Slope of both pipes (1 and 2) is 1.5%.
0.015
2.1 Use Ramser Kirpich formula and find time of concentration for both catchments:
(4 Marks)
Tc=0.0195L0.77Sa-0.385
Tc= Time of Concentration (min)
Sa= Average channel (main stream) slope (mm)
L= Flow length from farthest point of the catchment to outlet (m)
2.2 Determine the pipe size between x and Y(pipe 1).
2.3 Calculate the discharge into the river via (pipe 2).
2.4 Determine the pipe size between Y and Z(pipe 2).
Pipe flow chart: Appendix 1,(Colebrook-White graph)
Rainfall intensity: I=1930T+45mmh(T in minutes)
2 The diagram shows two catchments A and B . The

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!