Question: 2. The lowest level of the Work Breakdown Structure (WBS) is called Work Package, that is the basic unit used for planning, scheduling, and controlling
2. The lowest level of the Work Breakdown Structure (WBS) is called Work Package, that is the basic unit used for planning, scheduling, and controlling the project.
- List 4 key characteristics of each Work Package[2 mark]
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
