Question: 2.) Using a future worth analysis with a MARR of 20%/year, determine the preferred gate. The management of Brawn Engineering is considering three alternatives to

2.) Using a future worth analysis with a MARR of 20%/year, determine the preferred gate.
The management of Brawn Engineering is considering three alternatives to satisfy an OSHA requirement for safety gates in the machine shop. Each gate will completely satisfy the requirement, so no combinations need to be considered. The first costs, operating costs, and salvage values over a 5-year planning horizon are shown below. End of Year Gate 1 Gate 2 Gate 3 0 1 2 $15,000 $19,000 -$24,000 $6,500 -$5,600 -$4,000 -$6,500 $5,600 -$4.000 -$6,500 -$5,600 -$4,000 -$6,500 $5,600 -$4,000 -$6,500 + $0 $5,600 + $2,000 $4,000+ $5,000 3 4 5 What is the future worth of each alternative? Gate 1: $ Gate 2: $ Gate 3: $ Carry all interim calculations to 5 decimal places and then round your final answer to the nearest dollar. The tolerance is +10. The management of Brawn Engineering is considering three alternatives to satisfy an OSHA requirement for safety gates in the machine shop. Each gate will completely satisfy the requirement, so no combinations need to be considered. The first costs, operating costs, and salvage values over a 5-year planning horizon are shown below. End of Year Gate 1 Gate 2 Gate 3 0 1 2 $15,000 $19,000 -$24,000 $6,500 -$5,600 -$4,000 -$6,500 $5,600 -$4.000 -$6,500 -$5,600 -$4,000 -$6,500 $5,600 -$4,000 -$6,500 + $0 $5,600 + $2,000 $4,000+ $5,000 3 4 5 What is the future worth of each alternative? Gate 1: $ Gate 2: $ Gate 3: $ Carry all interim calculations to 5 decimal places and then round your final answer to the nearest dollar. The tolerance is +10
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
