Question: 21 A work element in a worker-machine cycle has been reduced to the following two MOST activity sequence models: A3B10G3AB10P3A3 A,B,G, MXTI,Az In the second

21 A work element in a worker-machine cycle has
21 A work element in a worker-machine cycle has been reduced to the following two MOST activity sequence models: A3B10G3AB10P3A3 A,B,G, MXTI,Az In the second sequence model, the process time is known to be 9.3 sec. This value must be converted to the correct index value, symbolized by the subscript T for the X parameter in the second sequence model. (a) What is the correct value of T? (b) Determine the normal time in seconds that would be allocated for this work element