Question: 2.1 Using the table provided below, calculate the late start of activity C. You are not required to show your calculations, simply provide your answer.
2.1 Using the table provided below, calculate the late start of activity C. You are not required to show your calculations, simply provide your answer. (5) Activity Name Predecessor Duration Duration A None 5 B A 2 C A 6 D A 3 E D 12.2 Using the table provided below, calculate the early finish of activity D. You are not required to show your calculations, simply provide your answer. (5) Activity Name Predecessor Duration Duration A None 5 B A 2 C A 6 D A 3 E B,C,D 12.3 Using the table provided below, calculate the duration of the critical path. You are not required to show your calculations, simply provide your answer. (5) Activity Name Predecessor Duration Duration A None 5 B A 2 C A 6 D A 3 E B,C,D 1 QUESTION THREE [30]3.1 Following the COVID-19 pandemic, the banks in South Africa have raised the annual interest rates
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
