Question: (2.5 marks) Question 1: The software project estimates the size of the code with 3 parameters. a. an estimate of the total number of lines

 (2.5 marks) Question 1: The software project estimates the size of

(2.5 marks) Question 1: The software project estimates the size of the code with 3 parameters. a. an estimate of the total number of lines of new code is 2300 kloc b. an estimate of the reuse code calculated using reuse model is 3000 kloc. c. an estimate of the lines that are likely to be modified is 2000 kloc. The productivity multiplier is estimated to be 4.3. Using Post-Architecture Cocomo sub-model Calculate the Person-month for the given project Estimations. Show the steps of calculating the exponent factor B