Question: 2.5 Work breakdown structure (WBS) Instructions To remain on track, complete by the end of module six Refer to the assessment criteria Refer to your

2.5 Work breakdown structure (WBS) Instructions To remain on track, complete by the end of module six Refer to the assessment criteria Refer to your Component Analysis in which 20 activities were identified. Utilise these 20 Activities for the remainder of your assignment Resultant of your Risk Assessment, mitigation and or contingencies items should have been developed and included in your Component Analysis The WBS should show the following data as extracted from the Component Analysis: WBS number, Deliverables (Inclusions) and Activities The WBS does not show Exclusions, Assumptions or Risks Draw a WBS and insert it into this section If the outlay of the WBS is too large for an A4 page, insert an A3 page, or copy sections of the WBS on subsequent pages If the WBS is done in Excel, copy and paste your information into this section in either PDF format or as an image (do not insert links to other documents!)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
