Question: 27. Evaluate the following project using an IRR criterion, based on an opportunity cost of 10%:CF0=6,000,CF1=+3,300,CF2=+3,300. Accept, since IRR exceeds opportunity cost. Reject, since opportunity
27. Evaluate the following project using an IRR criterion, based on an opportunity cost of 10%:CF0=6,000,CF1=+3,300,CF2=+3,300. Accept, since IRR exceeds opportunity cost. Reject, since opportunity cost exceeds IRR. Accept, since opportunity cost exceeds IRR. Reject, since IRR exceeds opportunity cost