Question: 3 . 1 Consider a process with six sinks and five sources ( Sorin and Bedard . The process data are given in Tables 3

3.1 Consider a process with six sinks and five sources (Sorin and Bedard
. The process data are given in Tables 3-7 and 3-8. Fresh water is used
in the sinks and it is desired to replace as much fresh water as possible
using direct-recycle of process sources. Determine the target for minimum
usage of fresh water and waste discharge after direct-recycle. How many
material recycle pinch points are there? What is their significance?
i need the graphical solution not algebric,please.
 3.1 Consider a process with six sinks and five sources (Sorin

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Chemical Engineering Questions!