Question: 3 . 2 At a machine tool plant, five jobs must be completed each day. The time it takes to do each job depends on
At a machine tool plant, five jobs must be completed each day. The time it takes to do each job depends on the machine used to do the job, but not every machine can handle every job. If a machine is used at all, there is a onetime only setup time required. The relevant times in minutes are given below.
Each machine can handle at most two jobs per day, and in addition, since machines and require the same people to do setup, an additional minutes is needed if both machines are used. Determine how to minimize the sum of the setup and machine operation times needed to complete all jobs.
No need to solve the problem, only give the mathematical formulations"!!!!!!
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock