Question: At a machine tool plant, five jobs must be completed each day. The time it takes to do each job depends on the machine used
At a machine tool plant, five jobs must be completed each day. The time it takes to do each job depends on the machine used to do the job. If a machine is used at all, a setup time is required. The relevant times (in minutes) are given in the file P06_59.xlsx.
a. Determine how to minimize the sum of the setup and machine operation times needed to complete all jobs.
b. Use SolverTable to see how a change in the setup time for machine 4 changes the optimal solution.
c. Use SolverTable to see how a change in the required time for machine 1 to complete job 3 changes the optimal solution.
Step by Step Solution
3.35 Rating (161 Votes )
There are 3 Steps involved in it
Assigning jobs to machines Times to do jobs large times mean machine cant do job and setup times Job ... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (3 attachments)
1497_60b741248db0e_696575.pdf
180 KBs PDF File
1497_607c14f689128_696575.xlsx
300 KBs Excel File
1497_60b741248db0e_696575.docx
120 KBs Word File