Question: ( 3 5 points ) A General Cargo vessel, preparing for entering a floating dry dock, ballasts the forward Double Bottom and Deep tanks until
points A General Cargo vessel, preparing for entering a floating dry dock, ballasts the forward Double Bottom and Deep tanks until she has her trim by the stern reduced to with a mean draft of Her dimensions and other characteristics are as given below. The floating drydock can be given a trim by the stern to ease the docking loads imposed on the vessel. The vessel's initial landing point is located aft of midship. Determine:
a the trimming moment developed during the drydocking,
b the maximum potential force on the vessel's bottom structure just before full landing on the keel docking blocks?
c the vertical lift given the vessel, as it becomes fully landed and the vessel's drafts
d forvard and aft when it has become fully landed on the docking blocks? Maintain mm accuracy in your calculations.
Given: ;;;
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
