Question: [ 3 5 points ] You have been asked to review the proposed construction plan for the caissons supporting the main - span bridge piers
points You have been asked to review the proposed construction plan for the caissons supporting the mainspan bridge piers for this project. The construction contractor for the project has proposed to excavate an opencut, braced sheetpile cofferdam as shown to form the caissons in the dry". The contractor intends to provide a sump pit at the bottom of the excavation and remove any infiltrating ground water from the bottom of the excavation using a lift pump. Within the sheetpile cofferdam, this will maintain a water level that is essentially
equal to the bottom of the excavation. You have determined that the clayey silt at the bottom of the caisson excavation is hydraulically connected to the river channel and have drawn the flow net shown below.
Applicable construction safety codes specify that a factor of safety of must be maintained against liquefaction or heave of the excavation bottom. If the factor of safety is not provided eg due to high levels in the adjacent river channel, then the contractor must flood the excavation with water and then resume construction when the river stage has fallen to safer levels.
a At the high water level of el what is the pore water pressure at Point A
b Shade the flow element exhibiting the largest seepage velocity, regardless of river stage.
c At the high water level of el what is the rate of seepage into the excavation, assuming the excavation is feet wide into the page
d At what river stage should the contractor begin flooding the excavation to maintain the required factor of safety against liquefaction?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock