Question: 3 5 ) what is the method for modelling building envelope components in HOT 2 0 0 0 when construction details ( eg . lumber
what is the method for modelling building envelope components in HOT when construction details eg lumber sizes and spacing, type of insulation... are known?
athe code selector
ba specific RSIrvalue
ca user specified RSIRvalue
dthe composite RSIR calculation
as part of the basic service data collection procedures what info must be collected for a central air conditioner?
aequipment type, basement cooled or not cooled, model number rated capacity
bairflow rate supply, circulation power, composite space cooling efficiency equipment type
cinstallation centification number, instullation data, installer name and company AHRI number
dcoefficient of performance, during to basement, rating condition efficiency, cutoff temp
while provinding the basic service for a semidetached house, the energy advisor encounters a living area that is located above an unheated garage, how should this living area be measured?
alength and depth to the nearest cm
blength and depth to the nearest cm
clength and depth to the nearest cm
dlength and depth to the nearest cm
what data must be recorded for a townhouse that has room air conditioner window units and one room air conditioner singlehose portable unit?
athe total number of air conditioner units
bthe SEER rating of the window units only
cthe manufacturer and model number of the window units only
dthe manufacturer, model number and SEER rating of the portable unit only
in a house where an attached garage provides heated storage for up to vehicles, how would an energy advisor assess the floor of living area located immediatly above this parking garage
afloor header
bexposed floor
cfloor above frostline
d floor ablve foundation
during the process of the constrion blower door service, which of the following steps is required when a builder aims to meet a specific airtighness target?
atape intentional openings
bperform a duct leakage test
cconduct an exhaust devices depressurization test
dhave the builder seal air leaage points
actual blower door test results are modelled in the "air leakage test data" tap of HOT why does this fail the requirement of a valid test?
athe relative error is too high
bthere is a data point with too much error
cthe flow exponent is outside the allowable range
dthe correction coefficient is outside the allowable range
how would tank type be modelled in HOT for the domestic hot water system shown below?
aconventional tank
binstantaneous
cinduced draft
ddirect vent
which of the fllowing is the most appropriate course of action when providing info regarding an insulation contractor?
aproviding the homeowner with business cards from local insulation contractors
binforming the homeowner of insulation contractors that are personally known by the energy advisor
creferring the homeowner to the publication entitled get it in writing
dmaking arrangements for a salesperson from your service organization or an affiliated company that provides insulation contact the homeowner with a quote
if vermiculite insulation is exposed to the interior environment how should an energy advisor proceed?
acollect a sample and submit it for asbestos analysis
bdocument its presence and proceed with the airtighness test
ccontinue with the evaluation but do not perform an airtighness test
dreport to the homeowner that the insulation should be removed and disposed of
if vermiculite is observed in an enclosed space atttic or wall and is not exposed to the interior environment what procedure should be followed?
arefrain from performing an air tightness test
badvise the homeowner to have the vermiculite removed
cignore the vermiculite and do not mention it to the homeowner
dprovide a hard copy of the document health risk asbestos or a link to the web page
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
