Question: 3 . A pile is sited on 4 . 5 m of very soft clay silt overlying stiff to very stiff clay. Tests on undisturbed

3. A pile is sited on 4.5m of very soft clay silt overlying stiff to very stiff clay. Tests on undisturbed samples gave the shear depth relationship in the table below. A 500mm diameter steel pile is to be used. Determine the required penetration to carry a safe working load of 400kN