Question: 3 a . Which operation is the bottleneck? Boring; Milling; Assembly; Welding; Cutting 3 b . The bottleneck time = ? Minutes per unit 3
a Which operation is the bottleneck? Boring; Milling; Assembly; Welding; Cutting
b The bottleneck time Minutes per unit
c For the entire production system, the throughput time minutes?
d If the company operates shifts per day, hours per shift, and days per month, the
capacity of this production system
units per month