Question: 3 a . Which operation is the bottleneck? Boring; Milling; Assembly; Welding; Cutting 3 b . The bottleneck time = ? Minutes per unit 3

3a. Which operation is the bottleneck? Boring; Milling; Assembly; Welding; Cutting
3b. The bottleneck time =? Minutes per unit
3c. For the entire production system, the throughput time -=? minutes?
3d. If the company operates 2 shifts per day, 8 hours per shift, and 20 days per month, the
capacity of this production system =
?units per month
 3a. Which operation is the bottleneck? Boring; Milling; Assembly; Welding; Cutting