Question: please help, thanks [Supplement 7] Capacity and Bottleneck Analysis A production system at Lakeview Manufacturing is given in the flowchart below. The bending operation occurs

please help, thanks [Supplement 7] Capacity and
please help, thanks [Supplement 7] Capacity and
please help, thanks [Supplement 7] Capacity and
please help, thanks
[Supplement 7] Capacity and Bottleneck Analysis A production system at Lakeview Manufacturing is given in the flowchart below. The bending operation occurs separately from, and simultaneously with, cutting and drilling, which are independent and sequential operations. A product needs to go through only one of the three parallel assembly operations. The product then proceeds to the last workstation for testing. Assembly 2.5 units/hour Cutting 10 units/hour Drilling 5 units/hour Welding 3 units/hour Assembly 2.5 units/hour Testing 12 units/hour Bending 4 units/hour Assembly 2.5 units/hour Question 36 (4 points) Which operation is the bottleneck? Bending Cutting Assembly Welding Drilling Testing Question 37 (4 points) The bottleneck time A minutes per unit. Use 2-decimal accuracy for the final answer, e.g., 0.12, when necessary. Question 38 (4 points) For the entire production system, the throughput time = A minutes. Use 2-decimal accuracy for the final answer, e.g., 0.12, when necessary. Question 39 (4 points) If the company operates 3 shifts per day, 8 hours per shift, and 5 days per week, the capacity of this production system A/ units per week. Use 2-decimal accuracy for the final answer, e.g.. 0.12, when

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!