Question: 3. Consider the following two projects: NPV 1. Project B 137.30 83.83 Crossover rate 16.06 Project A 15.00 26.06 28.02 29.38 Discount rate In consideration
3. Consider the following two projects: NPV 1. Project B 137.30 83.83 Crossover rate 16.06 Project A 15.00 26.06 28.02 29.38 Discount rate In consideration of NPV what the preferred project is if: a) The discount rate is less than 26.06%? Project: b) Which project has the highest IRR? Project: c) Which project is preferred at a NPV of 16.06%? Project: d) Which is the preferred project of the two and for which range of discount rates? Project: from 96 to % discount rate