Question: 3 points Save Answer A machine shop is being used to produce part type A Production rate is 80 unit/day and the processing time is

3 points Save Answer A machine shop is being used

3 points Save Answer A machine shop is being used to produce part type A Production rate is 80 unit/day and the processing time is 15 min/unit, the shop is open for 8 hrs./day and the machine efficiency is 90%, how many machines needed to meet the required demand? For the toolbar, press ALT+F10 (PC) or ALT+FN+F10 (Mac)