Question: 3. The data below represent time study observations for an aksembly operation. Assume a 7% allowance factor: What is the butmal time for each clement?
3. The data below represent time study observations for an aksembly operation. Assume a 7% allowance factor: What is the butmal time for each clement? What is the standard time for the assembly cperatien