Question: 3. The ES for Node A is: a. 0 b. 1 c. 5 d. 10 The ES for Node F is: a. 0 b. 4

3. The ES for Node A is: a. 0 b. 1 c. 5 d. 10 The

3. The ES for Node A is:

a.

0

b.

1

c.

5

d.

10

  1. The ES for Node F is:

    a.

    0

    b.

    4

    c.

    11

    d.

    15

  1. The EF for Node C is:

    a.

    4

    b.

    5

    c.

    11

    d.

    15

  2. The LS for Node A is:

    a.

    0

    b.

    1

    c.

    5

    d.

    10

  3. The length of the critical path is:

    a.

    9

    b.

    13

    c.

    19

    d.

    There is no critical path

Use the following information to answer questions 3-6. B 6 CO A 5 F 4 5 0: Start 4