Question: 3 The snapback timing method was used to obtain the average times and performance ratings for work elements in a manual repetitive task. See table

3 The snapback timing method was used to obtain the average times and performance ratings for work elements in a manual repetitive task. See table below. All elements are worker-controlled. All elements were performance rated at 85%. Element e is an irregular element performed every five cycles. A 15% allowance for personal time, fatigue, and delays is applied to the cycle. the standard time for this cycle in minutes is * (3 Points) b c d Work element Observed time (min) 0.32 0.85 0.48 0.55 1.50 2.44 2.95 3.24 4.31 2.13