Question: 4 5 6 Question 7 (2 points) ) Listen 7 8 9 A quality control engineer is implementing a routine because he claims the inspections

4 5 6 Question 7 (2 points) ) Listen 7 8 9 A quality control engineer is implementing a routine because he claims the inspections will be completed faster than the current mean time of 25 minutes. This 10 11 routine will be tested on 16 assembly lines. A hypothesis test of Ho: M = 25 vs. Ha: