Question: 4 . 9 . An as - built survey is done to establish the floor elevations of a classroom building that will undergo renovations. The

4.9. An as-built survey is done to establish the floor elevations of a classroom building that will undergo renovations. The building has two main floors, multiple changes of elevation on the main floor, a mezzanine level, and a partial basement. Notes for the survey are shown below. What is the difference in elevation between
a. The first and second floors at the east end of the building.
b. The first and second floors at the north end of the building.
c. The second floor and the mechanical room floor (basement).
d. The north entrance and the floor of the office suite on the northeast corner (mezzanine level)?
\table[[Station,BS,HI,FS,SS,Elev.,Description],[BM1,4.58,,,,100.00,x on conc., 1st floor, east entry],[TP1,8.25,,1.59,,,],[TP2,8.19,,1.60.,,,],[1,4.59,,4.62,,,x on conc., 2nd floor, top of east stairs],[TP3,4.58,,4.46,,,],[2,2.25,,4.60,,,x on conc., 2nd floor, top of north stairs],[TP4,4.61,,11.75,,,],[TP5,1.65,,8.83,,,],[3,4.58,,4.58,.,,x on conc., 1st floor, north entry],[4,4.58,,3.91,,,x on conc., top of ramp in N-S hallway],[5,4.64,,1.91,,,x on conc., top of ramp in E-W hallway],[6,,,,9.25,,Floor of mezzanine level],[7,,,,5.76,,Floor of sunken area in main lobby],[8,,,,15.22,,Floor of mechanical room, basement level],[BM1,,,4.64,,,]].
Calculate HI for allstations except 6,7,and 8 because these are intermediate station. Calculate all station and SS elevatios.
Show steps
4 . 9 . An as - built survey is done to establish

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!