X Solar Inc. was established in and operates as a mediumscale industry in Sydney, Nova Scotia, producing solar panels that are exported to various countries. Details of the current solar panel assembly line are provided in Tables and The assembly line operates for one hour shift each day, achieving a production rate of units daily.
Table : Operations, time, and precedence relations
Operation
Time sec
Precedence relation
DZDuoo
EgI
E
Page of
Workstation
Operation
Time
sec min
sec min
sec min
sec min
V
sec min
sec min
Table : Current Assembly Line
VI
Draw the precedence diagram for these operations point
Calculate the cycle time and compare it with the actual cycle time in the current assembly line point
Calculate the efficiency of the current assembly line point
The company aims to balance the assembly line and boost efficiency. As an operations manager, you are responsible for balancing this assembly line using the algorithm you have learned in class. Once the line is balanced, you will calculate the efficiency of the production line and determine the percentage change compared to the current line points
Finally with the company operating days per year, you need to calculate the expected annual production for both the current and the balanced assembly lines.
Reflect on the potential impacts of these changes on production efficiency and output points
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock