Question: 4. Determine Critical Path, and slack (float) times for all activities. 12 014 Dummy AOS BLO 2 C15 H0.4 ILA 10.5 10 11 Fo.a Dummy

4. Determine Critical Path, and slack (float)
4. Determine Critical Path, and slack (float) times for all activities. 12 014 Dummy AOS BLO 2 C15 H0.4 ILA 10.5 10 11 Fo.a Dummy G1.0 Rules of the AOA (activity on are) network states that two nodes can be connected by at most one are, Breaking this rule is avoided by adding in a Dummy Activity