Question: 4) For a rapid mixing unit with an average flow of 5000m3/ day, a 500 -watt motor at maximum flow is selected. Assuming the waiting

4) For a rapid mixing unit with an average flow of 5000m3/ day, a 500 -watt motor at maximum flow is selected. Assuming the waiting time in the pipeline is 0.5s, calculate the velocity gradient for water at 10C