Question: 4. Kim's engineering has a plan to build a new factory to expand their business. Consider the project with the following dependency matrix and the


4. Kim's engineering has a plan to build a new factory to expand their business. Consider the project with the following dependency matrix and the expected time for each activity. - Draw an activity network for the project (15 points) - Compute the total slack time of the project using EST, ECT, LST, LCT (15 points) - Draw a Gantt chart for the project (15 points) 4. Kim's engineering has a plan to build a new factory to expand their business. Consider the project with the following dependency matrix and the expected time for each activity. - Draw an activity network for the project (15 points) - Compute the total slack time of the project using EST, ECT, LST, LCT (15 points) - Draw a Gantt chart for the project (15 points)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts