Question: ( 4 points ) A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles

(4 points) A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table.
\table[[,Observations (minutes per cycle)],[Element,Rating,1,2,3,4,5,6,],[1,90,0.41,0.46,0.36,0.36,0.36,0.36,],[2,85,1.41,1.41,1.36,1.36,1.36,1.41,],[3,100,0.76,0.76,0.66,0.71,0.76,0.71,],[4,85,1.01,1.06,1.01,1.06,1.06,1.11,]]
a. Determine the average cycle time for each element.
b. Find the normal time for each element.
c. Assuming an allowance factor of 11 percent of job time, compute the standard time for this job.
 (4 points) A time study was conducted on a job that

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!