Question: 4 pt - 3 Traverse Problem Statement A traverse was run on a small job site using a Total Station. Assume angles were measured with
pt Traverse Problem Statement
A traverse was run on a small job site using a Total Station. Assume angles were measured with equal precision. Perform all calculations necessary to solve for a Northing & Easting coordinate value for each point in the closed traverse below. Report your latitude, departure & LEOC errors per the required table summary format.
The coordinates of point are N and E
The provided Azimuth is for the line measured at point pt TRAVERSE PROBLEM