Question: ( 4 PT ) Your survey crew is performing a traverse loop to set control for a new building. The loop has a total horizontal

(4 PT) Your survey crew is performing a traverse loop to set control for a new building. The loop has a
total horizontal distance of 942.85 ft . Your contract with the client states that you will provide a closed
error of closure?
(6 PT) Your survey crew is performing a differential level loop. If your backsight rod reading =9.04ft and
your foresight reading =7.87ft, what is the difference in elevation between the backsight point and the
foresight point? Which point is higher in elevation?
(3 PT) You are required to mark out a horizontal distance of exactly 500 ft along a road with a
uniform grade of 15%. What distance must you mark out along the slope of the road to equal a
horizontal distance of 500 ft ?
(3 PT) A surveyor determined that their unit pace is 2.71 ft . If the surveyor needs to mark out a.
distance of 450 ft on a flat, level surface, how many paces are required? Round your answer to
the nearest whole pace.
(3 PT) Your survey crew is performing a differential level loop, and you are reading the level rod
and taking field notes. You record a backsight as 4.38 even though what you read on the rod was
5.38. What kind of error did you make?
a. Systematic
b. Blunder
c. Accidental
d. Topographic
( 4 PT ) Your survey crew is performing a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!