Question: 4. Suppose we have three machines for which machine coupling is to be investigated, the machines are; one of type A and two of type

4. Suppose we have three machines for which
4. Suppose we have three machines for which machine coupling is to be investigated, the machines are; one of type A and two of type B. The operator rate is $6/hr. and the operating cost of machine A and B are $12 and $18 per hour respectively. It takes the operator 30 seconds to move from one machine to the next. What is the optimum number of operators to minimize the production cost given the following cycle times in minutes. Draw the man-machine chart for the optimum arrangement. Machine A 2 Loading Processing Cycle time 12 4. Suppose we have three machines for which machine coupling is to be investigated, the machines are; one of type A and two of type B. The operator rate is $6/hr. and the operating cost of machine A and B are $12 and $18 per hour respectively. It takes the operator 30 seconds to move from one machine to the next. What is the optimum number of operators to minimize the production cost given the following cycle times in minutes. Draw the man-machine chart for the optimum arrangement. Machine A 2 Loading Processing Cycle time 12

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock