Question: 42. A Lean Six Sigma Green Belt practitioner constructs a control chart to ... Fill up some slides and beef up the presentation No answer
42. A Lean Six Sigma Green Belt practitioner constructs a control chart to ...
Fill up some slides and beef up the presentation
No answer text provided.
show if a process will meet the customer needs
show the stability of a process
43. A six sigma process can be characterized by:
a Cp=1.5 and a Ppk=2.00
a Cp=3.00 and a Ppk=1
a Cp=6.00 and a Ppk=15
a Cp=2.00 and a Ppk=1.5
44. Total Production Maintenance (TPM) is:
None of these
Changes to every phase of a process
Gets an early version of a solution out quickly to a particular segment
A way of eliminating downtime with machinery by way of performing proactive, routine maintenance. It helps to ensure longevity of equipment.
45. Who benefits from successful Lean Six Sigma projects?
Customers and/or staff members
The Black Belt
The government
No one
46. HRO stands for:
Group of answer choices
None of these
Home Run Optimization
Highly Regular Organization
High Reliability Organization
47. The following are all CAP (Change Acceleration Process ) Tools except:
Group of answer choices
Charter
Making Change Last Check Lists
Threat vs Opportunity Matrix
Elevator Speech
48. Avoiding inadvertent errors by using design features to reduce human error or eliminate process failure is known as:
Group of answer choices
Gemba
Poka Yoke
Kanban
Muda
49. What does the 'P' stand for in the acronym SIPOC?
Group of answer choices
Practice
Petition
Nothing, its not an acronym
Process
50. Lean and Six Sigma are often combined together because......
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts