Question: 5. [10]. Determine the minimum cost increase to reduce the project duration by 3 days: 15042550256200300865075050400100050 ANSWER: $1100 crash A by 10ay(+150) then AB by

 5. [10]. Determine the minimum cost increase to reduce the project

5. [10]. Determine the minimum cost increase to reduce the project duration by 3 days: 15042550256200300865075050400100050 ANSWER: $1100 crash A by 10ay(+150) then AB by ond doy (+88) ? then & by ree doy (+6) 5. [10]. Determine the minimum cost increase to reduce the project duration by 3 days: 15042550256200300865075050400100050 ANSWER: $1100 crash A by 10ay(+150) then AB by ond doy (+88) ? then & by ree doy (+6)