Question: 5 . 7 The critical path is the longest sequence of connected activities through the network and is defined as the path with zero slack

5.7 The critical path is the longest sequence of connected activities through the network and is defined as the path with zero slack time.
True
False
 5.7 The critical path is the longest sequence of connected activities