Question: 5 . A contractor is getting soil fill from a 3 0 0 ft x 2 0 0 ft borrow pit. The soil will be
A contractor is getting soil fill from a ft x ft borrow pit. The soil will be excavated to a depth of ft The swell factor of the soil is and the specific weight of the soil after excavation will be lbft A single truck will be used to transport all the soil volume to a dump site. The truck's maximum capacity per load is the lesser of yd or tons. How many loads will be required to transport the soil fill to the dump?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
