Question: 5 - b ) You are required to set concrete for a foundation of a 1 0 - strorey building. Explain what factors / parameters
b You are required to set concrete for a foundation of a strorey building. Explain what factorsparameters should be considered for the following points from mixing to setting the concrete.
i The concrete is set in August with a high humidity.
iiThe foundation is located near the seafront with a high risk of sulphate attack.
iii.Assume that the foundation has a dense reinforcement.
iv The batching concrete mixture is located far from the foundation.