Question: 5 . Consider two different machines A and B that could be used at a station. Machine A has a mean effective process time te

5. Consider two different machines A and B that could be used at a station. Machine A has a
mean effective process time te of 1.0 hours and an SCV c2
e of 0.25. Machine B has a mean
effective process time of 0.85 hour and an SCV of 4.(Hint: You may find a simple
spreadsheet helpful in making the calculations required to answer the following questions.)
(a) For an arrival rate of 0.92 job per hour with c2
a =1, which machine will have a shorter
average cycle time?
(b) Now put two machines of type A at the station and double the arrival rate (i.e., double
the capacity and the throughput). What happens to cycle time? Do the same for machine
B. Which type of machine produces shorter average cycle time?
(c) With only one machine at each station, let the arrival rate be 0.95 job per hour with
c2
a =1. Recompute the average time spent at the stations for both machine A and
machine B. Compare with (a).
(d) Consider the station with one machine of type A.
304 Part II Factory Physics
i. Let the arrival rate be 1
2 job per hour. What is the average time spent at the station?
What happens to the average time spent at the station if the arrival rate is increased
by 1 percent (i.e., to 0.505)? What percentage increase in wait time does this
represent?
ii. Let the arrival rate be 0.95 job per hour. What is the average time spent at the
station? What happens to the average time spent at the station if the arrival rate is
increased by 1 percent (i.e., to 0.9595)? What percentage increase in wait time does
this represent?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!