Question: 5 . Consider two different machines A and B that could be used at a station. Machine A has a mean effective process time te
Consider two different machines A and B that could be used at a station. Machine A has a mean effective process time te of hours and an SCV ce of Machine B has a mean effective process time of hour and an SCV of Hint: You may find a simple spreadsheet helpful in making the calculations required to answer the following questions.
a For an arrival rate of job per hour with ca which machine will have a shorter average cycle time?
b Now put two machines of type A at the station and double the arrival rate ie double the capacity and the throughput What happens to cycle time? Do the same for machine B Which type of machine produces shorter average cycle time?
c With only one machine at each station, let the arrival rate be job per hour with c a Recompute the average time spent at the stations for both machine A and machine B Compare with a
d Consider the station with one machine of type A
i Let the arrival rate be job per hour. What is the average time spent at the station?
What happens to the average time spent at the station if the arrival rate is increased by percent ie to What percentage increase in wait time does this represent?
ii Let the arrival rate be job per hour. What is the average time spent at the station? What happens to the average time spent at the station if the arrival rate is increased by percent ie to What percentage increase in wait time does this represent?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock