Question: 5 . Welding a . ) A welded blank is proposed for an automotive component. For this component, 2 pieces of steel plate 5 mm

5. Welding
a.) A welded blank is proposed for an automotive component. For this component, 2 pieces of steel plate 5 mm thick are to be arc-welded in an automated production process. The total length of the weld for each assembly is 275 mm . The weld bead is to be the full thickness of the part and is 4 mm wide. The specific energy of the material is \(14\mathrm{~J}/\mathrm{mm}^{3}\), and the efficiency of the process is \(85\%\). How much electrical energy is required per part?
E:
b.) If the process uses a constant voltage power supply with \(\mathrm{V}=20\) Volts, and a current of 110 amperes, how much time is required for each weld?
c.) The required production rate for this part is 2000/week. i ne wem stanon wnere me part is produced has a load/unload time of 20 seconds per part, and the station is in operation for 7 hours/day and 5 days/week. How many welding stations are necessary?
Number of stations =
d.) An alternative welder power supply is \(15\%\) less expensive, but is ony capadie or putung out 75 amperes at 20 V . If this power supply is selected, how many welding stations will be required?
Number of stations =
e.) If the lower cost power supply is used, will the cost per part for this operation be higher or lower? Assume the useful life of the power supply is 2 years.
5 . Welding a . ) A welded blank is proposed for

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mechanical Engineering Questions!