Question: 6 . 2 8 A proposed grading plan requires 2 2 3 , 1 2 0 m 3 of cut and 2 0 6 ,

6.28 A proposed grading plan requires 223,120m3 of cut and 206,670m3 of fill. Laboratory
tests on a series of undisturbed samples from the cut area produced the following results:
A series of modified Proctor tests on representative bulk samples produced a maximum
dry unit weight of 19.2kNm3 and an optimum moisture content of 10.2%. The project
specifications require a relative compaction based on the modified Proctor test of at least
90%.
(a) Determine the shrinkage factor and compute the required volume of import or
export, if any. Use the dry unit weight of the cut when computing any import or
export quantities.
(b) Determine the weight of any import or export soil, assuming it has a moisture
content equal to the average moisture content in the cut. Express your answer in
metric tons (1 metric ton =1000kg=1Mg).
6 . 2 8 A proposed grading plan requires 2 2 3 ,

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!