Question: 6 . A method has been engineered and a time study was completed on it . The method has produced an average overall time of
A method has been engineered and a time study was completed on it The method has produced an average overall time of minutes. The overall pace rating applied to the job was The company has PF&D allowances of
a Determine rated timenormal minutes, the total allowed timestandard minutes, the standard hour rate for the job per units, and pieces per hour.
b The labor rate per hours is $ per hour. What is the labor cost per unit?