Question: 6. Amber Manufacturing produces ceramic teapots. Amber allocates overhead based on the number of direct labor hours. The company is looking into using a standard
6. Amber Manufacturing produces ceramic teapots. Amber allocates overhead based on the number of direct labor hours. The company is looking into using a standard cost system and has developed the following standards (one "unit" is a batch of 100 teapots): 1(Click the icon to view the standards.) Actual cost and operating data from the most recent month are as follows: (Click the icon to view the actual results.) All manufacturing overhead is allocated on the basis of direct labor hours. Read the requirements Requirement 1. Calculate the standard cost of one batch. Standard cost Direct materials Direct labor Variable MOH Fixed MOH Total standard cost Standard cost per batch Requirement 2a. Calculate the direct material variances. (Enter the variances as positive numbers. Enter currency amounts to the nearest cent and your answers to the nearest whole dollar. Label the variances as favorable (F) or unfavorable (U). Abbreviations used: DM = Direct materials.) First, determine the formula for the price variance, then compute the price variance for direct materials. (1) x( (2) (3) Determine the formula for the quantity variance, then compute the quantity variance for direct materials. (5) (6) (7) =DM price variance = (4) ) = DM quantity variance (8) Requirement 2b. Calculate the direct labor variances. (Enter the variances as positive numbers. Enter currency amounts to the nearest cent and your answers to the nearest whole dollar. Label the variances as favorable (F) or unfavorable (U). Abbreviations used: DL = Direct labor.) First, determine the formula for the rate variance, then compute the rate variance for direct labor. (9) (10) (11) First, determine the formula for the efficiency variance, then compute the efficiency variance for direct labor. (13) (14) (15) ) = DL rate variance (12) ) = DL efficiency variance (16) Requirement 2c. Calculate the variable manufacturing overhead variances. (Enter the variances as positive numbers. Enter currency amounts to the nearest cent and your answers to the nearest whole dollar. Label the variances as favorable (F) or unfavorable (U).) First, determine the formula for the rate variance, then compute the rate variance for variable manufacturing overhead. (17) (18) Variable overhead (19) ) = rate variance (20) Now compute the variable manufacturing overhead efficiency variance. First determine the formula for the efficiency variance, then compute the efficiency variance for variable manufacturing overhead. (21) (22) Variable overhead (23) = efficiency variance = (24) Requirement 2d. Calculate the fixed manufacturing overhead variances. (Enter the variances as positive numbers. Label the variances as favorable (F) or unfavorable (U). Abbreviations used: MOH = Manufacturing overhead) Begin by computing the fixed manufacturing overhead budget variance. First determine the formula for the budget variance, then compute th budget variance for fixed manufacturing overhead. (25) (26) Fixed MOH = budget variance Now compute the fixed manufacturing overhead volume variance. First determine the formula for the volume variance, then compute the volume variance for fixed manufacturing overhead. (28) (29) Fixed MOH = volume variance (30) Requirement 3. Have the company's managers done a good job or a poor job controlling materials, labor and overhead costs? Why or why not? Overall, the managers have done a (31) that they have (32)- job of controlling materials, labor, and overhead costs. This is evidenced by the fai Requirement 4. Describe how the company's managers can benefit from the standard costing system. (If an input field is not used in the table, leave the input field empty; do not select a label.) The following are benefits of a standard costing system: (33) (34) (35) (36) (37) Do you think the company should continue with the standard cost system? The company (38). 1: Data Table 2: Data Table Standards: Direct material 40 pounds per batch at $4.00 per pound Direct labor 2.0 hours per batch at $19.00 per hour Variable MOH standard rate $3.00 per direct labor hour Predetermined fixed MOH standard rate $5.00 per direct labor hour Total budgeted fixed MOH cost $1,100 Purchased 2,550 pounds at a cost of $3.80 per pound Used 2,100 pounds in producing 50 batches Actual direct labor cost of $2,277 at an average direct labor cost per hour of $19.80 Actual variable MOH $391 Actual foied MOH $1,400 3: Requirements 1. Calculate the standard cost of one batch. 2. Calculate the following variances: a. The direct material variances. b. The direct labor variances. c. The variable manufacturing overhead variances. d. The fixed manufacturing overhead variances. 3. Have the company's managers done a good job or a poor job controlling materials, labor, and overhead costs? Why or why not? 4. Describe how the company's managers can benefit from the standard costing system. Do you think the company should continue with the standard cost system
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
