Question: 6. Complete the material requirement planning tables below using the bill of materials provided. The lead time for all items is 2 periods. The order

6. Complete the material requirement planning
6. Complete the material requirement planning tables below using the bill of materials provided. The lead time for all items is 2 periods. The order quantity for item B is 2500 units. B (2) C (3) Item Lead Lot size 1 N 3 4 5 time 2 Part A 2 L4L 1000 800 1000 | 1200 900 Planned Release Item 1 Lot size 4 2 3 5 Lead time 2 Part B 2500 0 2500 2300 Gross Requirement Scheduled Receipt Beginning Inventory Net Requirement Planned Receipt Planned Release Item 2 Lot size 4 3 5 Lead time 2 Part C 2000 Cross Requirement