Question: (6 Marks) McNight Handcraft manufactures window frames using a job costing system. During March, the following costs are incurred on Job 120 to manufacture
(6 Marks) McNight Handcraft manufactures window frames using a job costing system. During March, the following costs are incurred on Job 120 to manufacture 400 frames: Original Costs: Direct Materials $ 13,200 Direct Labour 16,000 Manufacturing Overhead Allocated 24,000 TOTAL $53,200 Direct costs of reworking 10 frames: Direct materials Direct labour TOTAL $2,000 3,200 $5,200 Required: a. Prepare the journal entry to record the rework costs, assuming the rework is attributable specifically to Job 120. b. Compute the cost per finished window frame for Job 120, assuming the reword is attributable specifically to this job. c. Prepare the journal entry to record the rework costs, assuming the rework is common to all jobs. d. Compute the cost per finished window frame for Job 120, assuming the rework is
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
